AVAILABLE 24/7 0418 882 285
HazWreck — Wreck & Protect
HazWreck crew preparing a Sydney site for dust-controlled floor works

Concrete grinding & floor preparation · Sydney-wide

Concrete Grinding Sydney — Back to Bare Slab

Carpet glue, tile beds, epoxy, membranes and trip hazards — ground off with planetary diamond grinding and industrial dust extraction, and the slab handed back clean. Our rig powers itself, so it works where the power is off, the building is occupied, or the site is mid-demolition. The end of every strip-out is a floor; we finish the job.

  • Dust-controlled diamond grinding
  • Self-powered — no site power needed
  • CM3 Prequalified
  • Fully Insured
  • 32 Five-Star Google Reviews
CM3 Certified — contractor WHS prequalification

Certified

WHS prequalified · ID 97024

Commercial floor prep & make-good

End-of-lease defits, retail and office make-goods, post-demolition slabs. Glue, tile bed, membranes and coatings ground off and the slab handed back bare — the last line of the make-good clause, closed.

Priced per m² by coating and area — written quote within 24 hours

Glue, paint & coating removal

Garages, shops, single rooms and small warehouses. Carpet glue, vinyl adhesive, tile bed residue, paint and sealers ground back to clean concrete, dust under control.

Fixed price from your photos and the floor size

Before · after — drag to compare

One Gladesville Gym, Glue In — Bare Slab Out

A full gym defit in Gladesville: black vinyl glue across the floor when the coverings came up, ground back to clean bare slab by our crew as part of the same strip-out contract. Drag the handle. These are our own job photos, not stock — and the suspect mastic on this site was lab-tested first, with the asbestos-containing sections removed under our Class B licence instead of ground.

The same Gladesville gym defit with the floor ground back to clean bare concrete
Gym floor covered in black vinyl adhesive after the coverings were lifted, before grinding
Before After
Drag to compare

Same Gladesville defit, days apart — the black glue floor and the finished slab.

Planetary floor grinder and dust extractors on a part-ground slab during a Gladesville gym defit
The rig at work: planetary grinder into industrial extraction — the glue comes off, the dust doesn’t fly.
HazWreck crew in masks and hi-vis grinding the floor of a stripped Gladesville gym tenancy
Our crew on the tools inside the same strip-out — one contractor, one programme.
Edge grinding machine with vacuum extraction working a doorway beside the stairs
Edges, doorways and stairs detailed with extraction on the hand machines.
Large open retail floor ground flat and clean, ready for handover
Handover: the whole tenancy floor flat, clean and ready for the next trade.

What comes off

If It’s Stuck to the Slab, It Comes Off

Every defit and internal demolition ends the same way: the fit-out is gone, the bins are full, and the slab is covered in whatever held the old floor down. Agents and landlords write “returned to bare slab” into the make-good for a reason — and it is the line most contractors leave for someone else. Diamond grinding with tooling matched to the coating takes glue, screed, epoxy and membranes back to clean, sound concrete in one visit.

We have been doing the hand-scale version of this on our strip-outs since day one — tile beds, adhesive, wall render. The trailer rig scales the same work to whole floors.

HazWreck crew stripping wall tiles and adhesive during a commercial amenities defit in Sydney

Carpet & vinyl glue

The black and yellow adhesive left when carpet tiles and vinyl come up — the classic end-of-lease problem. Ground off, not solvent-smeared. In pre-1990 buildings we test black mastic for asbestos before any machine touches it — see the FAQ.

Tile beds & adhesive

Screed beds and tile adhesive after a bathroom, kitchen or shopfront strip — ground flat so the next trade starts on a clean, level base.

Epoxy, paint & sealers

Failed epoxy floors, line marking, paint and curing compounds removed with diamond tooling matched to the coating.

Membranes & levelling compound

Waterproofing membranes and old levelling compound taken back to sound concrete before new falls or finishes go down.

Trip hazards & high spots

Uneven joints, high spots and lips ground flush — the quick fix that closes out a safety report.

Slab clean-up after demo

After an internal demolition or strip-out, the slab is ground, scraped and left ready for the builder — one contractor, start to slab.

Assessed, ground, handed over

How a Grinding Job Runs

1

Assess

Coating type, floor area and what is under it — from your photos, or on site for larger floors.

2

Set up

Self-powered rig in from the trailer: grinder, industrial extraction and our own generator. No site power needed.

3

Grind

Planetary diamond grinding, tooling matched to the coating — shrouded heads coupled straight to extraction.

4

Detail

Edges, corners and penetrations ground by hand, high spots flushed, the floor scraped and vacuumed.

5

Hand over

Clean bare slab, photos of the finished floor, and the waste out the door. Ready for the next trade.

Builders · agents · landlords · facility managers

The Last Line of the Make-Good Clause

“Returned to bare slab, free of adhesives and coatings.” That line stalls more handovers than the demolition does — because the strip-out contractor doesn’t grind, and the grinding contractor wasn’t on site. HazWreck closes it in one scope: the same licensed crew that strips the tenancy grinds the slab, photographs the floor, and hands the keys back done.

And because we treat silica dust with the same discipline as asbestos — shrouded tooling, industrial extraction, a SWMS that names the hazard — you get a floor done properly in a building that keeps trading around it.

  • One contractor from strip-out to bare slab — the make-good clause closed in a single scope
  • Self-powered: the rig carries its own generator, so power-abolished sites and occupied buildings are no problem
  • Dust managed like we manage asbestos — shrouded heads into industrial extraction, SWMS covering crystalline silica on every job
  • After-hours and overnight work in trading buildings — the same crew that does our commercial strip-outs
  • CM3-prequalified, so principal contractors and property groups can engage us without a separate WHS onboarding

Straight pricing

Priced Per Square Metre, Fixed in Writing

The rate depends on three things: what the coating is, how many square metres, and access. Glue comes off faster than failed epoxy; one big open floor grinds cheaper per metre than five small rooms. Send photos and the floor size and you get a written fixed price before we start — small jobs carry a minimum call-out, large floors are quoted by rate. No hourly open-enders.

Stripping it out anyway?

Strip-Out, Demolition and the Slab — One Contractor

The cheapest time to grind a floor is while the strip-out crew and the bins are already there. If the job starts with a defit, an internal demolition or asbestos flooring, we scope the slab into the same contract and hand back one finished floor instead of two half-finished trades.

Sydney-wide

Concrete Grinding Across Sydney

From our base in Homebush we cover the whole Sydney metro — the Inner West, Eastern Suburbs, North Shore, Northern Beaches, Hills District, Western Sydney, South West Sydney, the Sutherland Shire and the St George area. Because the rig is trailer-mounted and self-powered, regional jobs are on the table too — ask. Call 0418 882 285.

Straight answers

Concrete Grinding Sydney — Frequently Asked Questions

What can you grind off a concrete floor?

Carpet and vinyl glue, tile adhesive and screed beds, epoxy coatings, paint and line marking, curing compounds, waterproofing membranes, old levelling compound, and high spots or trip hazards. If it is stuck to the slab, diamond grinding with the right tooling takes it back to clean concrete.

The old black glue — could it be asbestos?

In pre-1990 buildings, sometimes yes. Black floor mastic under old vinyl and parquetry can contain asbestos — and grinding asbestos mastic is illegal without a Class A licence, because the machine turns a bonded product friable. This is where HazWreck is different from every grinding outfit in Sydney: we hold a SafeWork NSW Class B asbestos licence, we test suspect adhesive BEFORE any machine touches the floor, and if it comes back positive we switch to the licensed removal method instead of grinding. Anyone who offers to grind old black glue without testing it first is gambling with your building and their licence.

Do you need power on site?

No — and that is unusual for this class of machine. Our grinding rig is trailer-mounted with its own generator running the grinder and the industrial extraction, so we work on slabs where the power has already been abolished, in buildings mid-refurbishment, and on domestic jobs without three-phase. If the site has power, we can use it; we just never depend on it.

What about silica dust?

Concrete grinding generates crystalline silica dust, and NSW WHS rules treat it seriously — so do we. The grinding heads are shrouded and coupled straight to industrial dust extraction, edges are detailed with extraction on the hand tools, and every job runs under a SWMS covering silica controls. Managing hazardous dust is literally our trade — it is the same discipline we bring to licensed asbestos work.

Is this the same as polished concrete?

No. Grinding is preparation — removing coatings and adhesives and leaving a clean, flat, open surface for whatever comes next: new flooring, epoxy, levelling or sealing. Decorative polished concrete is a multi-stage finishing trade. We will tell you straight which one your job needs, and if it is a designer polish, we prepare the floor and say so rather than pretend.

How much does concrete grinding cost in Sydney?

It is priced per square metre, and the rate depends on the coating (glue comes off faster than a failed epoxy), the floor area and access. Send photos and the floor size and you get a written fixed price before we start — small areas carry a minimum call-out, large defit floors are quoted by rate. No hourly open-enders.

Can you grind straight after a strip-out or demolition?

Yes — that is the point. HazWreck does the strip-out or internal demolition and the floor in one scope, so the slab is ground while the crew and the bins are still on site. If another contractor did the strip-out, we come in behind them; either way the make-good does not stall waiting for a second trade.

Do you do house garages and small jobs?

Yes. Garages, single shops and rooms are priced from photos with a fixed price and usually done in a day or less. Because the rig powers itself, a garage with one power point is not a problem.

Get a floor price

Tell Us About the Floor

What is on it, roughly how many square metres, and where it is. Photos beat descriptions — a shot of the coating and one of the whole floor is usually enough for a fixed price. For make-goods and post-demolition slabs, book a site assessment and we will scope it with the strip-out.

  • Class B asbestos licence AD214755
  • CM3 prequalified · ID 97024
  • Fully insured
  • Builder licence 218233C
  • 32 five-star Google reviews
Residential or commercial?
How soon do you need it?

Your information is 100% safe and secure. Licensed, insured, fixed price.

Concrete grinding generates crystalline silica dust. HazWreck works to a SWMS with shrouded tooling and industrial dust extraction on every grinding job, in line with NSW WHS requirements.

Call Now Get a Free Quote