AVAILABLE 24/7 0418 882 285
HazWreck — Wreck & Protect
HazWreck crew planning the next task on site at the Plus Fitness Manly Vale strip-out

Clients & partners

Who We Work With

Head contractors, gym operators, property agents and asset owners across Sydney use HazWreck for commercial demolition, strip-out, asbestos and mould work, often in buildings that can’t close while we’re in them.

CM3 Certified — contractor WHS prequalification

Certified

WHS prequalified · ID 97024

Clients & projects

The Work Behind the Names

A client list means little without the job behind it. Each name below links to the write-up or the service it used, so you can see how the work actually ran.

Head contractor

Hicon Building

Our deepest builder relationship. Demolition and strip-out on the T1 Inbound Optimisation project, ceiling access for the T1 roof drainage works, licensed asbestos removal on a hangar project, hangar door removal pricing, and bathroom strip-outs underway now.

Head contractor · fit-out & refurbishment

Buildcorp

Engaged for strip-out works on a CBD office restack, starting October 2026.

Building services · repeat client

Laidre Group Services

Repeat night works in occupied CBD office towers on Pitt Street: a tenancy strip-out, plus ceiling and wall cut-outs with access panels installed so services could be reached. Also an office relocation from Bondi Junction to Surry Hills.

Fitness · two clubs

Plus Fitness

Gladesville: licensed asbestos removal, strip-out, demolition and adhesive grinding for a full gym conversion, including the asbestos nobody expected behind the walls. Manly Vale: strip-out and floor demolition, on site now.

Fitness · Penrith

World Gym

Six consecutive night shifts of strip-out and structural demolition, load-bearing walls included, inside a gym that opened every morning as normal. About 40 tonnes removed.

Retail tenancies · Penrith and Miranda

Westfield

Westfield Penrith: retail defit of the York Jewellers tenancy for its lease make-good, worked to the centre’s contractor rules. Westfield Miranda: a travel agency tenancy stripped back to base building in a single overnight shift.

Shopping centre · delivered for Millennial Constructions

Strathfield Plaza

A run of works through the centre’s refurbishment: licensed asbestos removal in two bathroom demolition sections, concrete walkway and driveway demolition, construction hoarding removal and a rooftop rubbish clear-out.

Commercial & industrial real estate

Bawdens

Basement clear-out at a commercial property in Manly Vale for one of Sydney’s longest-established commercial agencies, founded in Parramatta in 1966.

Builder · Surry Hills

Urban Core

Site labour support on a residential building project in Elizabeth Bay.

We’ve also worked with McDonald Jones, Jim’s Building Inspections, Greater Sydney Parklands, Lane Cove West. References, insurance certificates of currency and our CM3 prequalification are available on request.

On site now

Plus Fitness Manly Vale — Strip-Out in Progress

Our second Plus Fitness club. The tenancy is being stripped out and the old floor broken up and cleared, ready for the new gym fit-out. The full write-up will follow when we hand it back. Until then, here’s the crew at work.

HazWreck worker running a trolley-mounted breaker across the floor at the Plus Fitness Manly Vale site
Trolley breaker lifting the old floor finish.
HazWreck crew breaking up and clearing the floor inside the Plus Fitness Manly Vale tenancy
Floor demolition, crew working in pairs.
Stripped-back steel stud walls inside the Plus Fitness Manly Vale tenancy during demolition
Partitions stripped back to the studs.

Before you engage us

What a Head Contractor Gets on Day One

  • CM3 prequalification — our WHS system independently assessed. What CM3 involved.
  • SafeWork NSW Class B asbestos licence AD214755 — bonded asbestos comes out inside the same contract, with Form 65 notification handled by us.
  • Job-specific SWMS written to your site rules, signed on every shift.
  • Waste dockets and clearance paperwork — EPA-licensed disposal and independent clearance where the work needs it.
  • A crew that turns up with the right passes — inducted, licensed and ready to work under permit, at night if that’s when the building is free.

Meet the people behind the work on our About page, or browse every job in From the Site.

Tendering or programming a job?

Send Us the Scope

Drawings, the hazmat report and the access rules are all we need to price it. You’ll get a quote you can read, line by line, with the assumptions written down.

Residential or commercial?
How soon do you need it?

Your information is 100% safe and secure. Licensed, insured, fixed price.

Call Now Get a Free Quote