AVAILABLE 24/7 0418 882 285
HazWreck — Wreck & Protect

From the Site

Project Stories & Insights

Real projects, real lessons. What actually happens on Sydney sites — asbestos, demolition, strip-outs and the compliance that keeps programmes on track.

A North Bondi house fully enclosed in white shrink-wrapped scaffold containment during renovation asbestos removal
#017

The House in the Bubble — Asbestos Removal Inside a Wrapped North Bondi Renovation

A renovation on a tight North Bondi corner, with asbestos in the roof and the wall cladding. The builder wrapped the whole house in shrink-wrapped scaffold; our licensed crew stripped the asbestos inside it, stage by stage, without the street ever seeing a sheet come down.

6 min read
The single-storey Lambton house and its front garden before the knockdown-rebuild demolition
#016

Knockdown for a Rebuild in Lambton — and How Salvage Rights Sharpened the Price

A single-storey house making way for a knockdown-rebuild. We quoted while the DA was still with council, stripped the house softly, put the excavator through it in July — and priced the whole job with salvage rights, so the materials in the old house worked for the owner instead of against them.

6 min read
Long concrete block planter beds along the fence line at an Auburn school site before emergency demolition
#015

The 24-Hour Call-Out: Emergency Concrete Planter Demolition at an Auburn Private School

A private school site in Auburn, a head contractor with a problem, and a row of concrete block planter beds that had to be gone immediately. Quoted on the spot, crew mobilised in under 24 hours, on site before 7:30am — and the area handed back clean the next day.

5 min read
Blue fibro garage with a weathered Super Six asbestos-cement roof in Northmead before demolition
#014

One Day in Northmead: A Fibro Garage With a Super Six Roof, Gone by Knock-Off

A blue fibro garage with the classic Super Six asbestos-cement roof, quoted off a morning site visit and demolished under licence in a single day — sheets off by hand, walls down, everything double-wrapped, and the slab washed off for whatever comes next.

6 min read
HazWreck crew working in the excavation around a buried asbestos-coated water main at a Sydney Airport precinct site
#013

A Collapsed Trench, a Five-Day Clock and an Asbestos-Coated Water Main at Sydney Airport

A hangar project in the airport precinct, an old 200mm water main with an asbestos coating, and a head contractor with trades booked back-to-back. Then it rained overnight and the trench caved in. What happened next is why builders keep our number.

7 min read
Vacant apartment kitchen in Crows Nest with the original vinyl floor, photographed before the asbestos removal and strip-out
#012

The Building Inspector Found It First: Asbestos Vinyl Under a Crows Nest Kitchen, Out in a Day

A vacant apartment in Crows Nest, a renovation waiting to start, and a kitchen floor the building inspector flagged as asbestos. How the job was quoted the same day it was referred, why the owners corporation held the start until it had seen our insurance and licence, and what a kitchen strip-out with an asbestos floor actually involves.

7 min read
Galvanised fire damper duct exposed above the timber ceiling frame after an asbestos-cement panel was removed in an Elizabeth Bay apartment bathroom
#011

Asbestos in the Ceiling of Ten Apartment Bathrooms: Two Days, Every Resident Home the Same Night

A strata manager in Elizabeth Bay had a fire damper programme stalled by asbestos-cement ceiling panels in the bathrooms of an occupied mid-century block. How a four-unit quote became ten, why that made each bathroom cheaper, and how two mobilisations with a hygienist clearance after each put residents back in their homes the same evening.

8 min read
Long timber shed with a Super Six asbestos-cement roof on a rural block in Dural, photographed at the January inspection
#010

Super Six Asbestos Roof Removal and Shed Demolition in Dural: Roof Off Day One, Gone by Day Three

A fifteen-metre timber shed on a Dural block with the classic Super Six asbestos-cement roof. The owner wanted the lot gone — roof, frame, footings. How the asbestos came off under licence on day one, the excavator went in on day two, and the site was lawn again a week later.

7 min read
Fibro-clad house in Asquith with asbestos-cement eaves, photographed on the inspection visit before removal
#009

Asbestos Eaves on a Fibro House in Asquith: 13 Metres, Eight Days, Cleared the Same Afternoon

A homeowner in Asquith needed the asbestos eaves and some fibro cladding off two sides of the house before their builder could fit new eaves and windows — and needed it done inside a week. How the Form 65 clock set the date, what removal day looked like, and how the site was cleared and handed back the same day.

7 min read
Moisture meter reading 100 on a tiled bathroom wall during a mould inspection in a Dural home
#008

Mould That Kept Coming Back: New Fans, New Vents, Same Problem in Dural

A Dural family had done what everyone tells you to do about mould — better exhaust fans, subfloor ventilation — and it came back anyway, in the wardrobes, the bathroom and the laundry. The moisture meter told a different story: the water was coming from above.

7 min read
#007

HazWreck Is Now CM3 Certified

Our work health & safety management system has been independently assessed and prequalified through CM3 — the contractor standard principal builders and government asset owners check before you're allowed on site. What it means, and why we pursued it.

4 min read
#006

Nobody Noticed — Demolishing a Working Gym Without Closing It

Six consecutive night shifts inside a fully operational World Gym in Penrith. ~40 tonnes removed, load-bearing walls down under engineered propping, and the doors open every morning like nothing happened. Why live-environment structural demolition is its own discipline.

6 min read
#005

The Document That Really Controls Your Demolition Date

A weatherboard knockdown in Lambton, Newcastle. The drawings were ready — but the council's Notice of Determination set the real start date. Why consent conditions, neighbour notices and service disconnections decide your demolition programme.

6 min read
#004

One Night. One Crew. One Westfield Store.

An 88m² Flight Centre tenancy at Westfield Miranda, stripped to base building in a single overnight shift. Why retail defits are really a logistics exercise — and how loading-dock sequencing, not demolition, defines success.

5 min read
#003

500 Skylight Panels and the Job That Was Never Just Asbestos Removal

An enquiry to decontaminate asbestos glazing tape beneath ~500 skylight panels. Why the asbestos was the easy part — and how access, glass handling and reinstatement boundaries really define a job like this.

6 min read
Aircraft hangar at Sydney Airport with large structural hangar doors being prepared for removal
#002

Removing Aircraft Hangar Doors at Sydney Airport — Why We Didn't Give a Fixed Price

Up to six aircraft hangar doors to remove at Sydney Airport, with the crane class hanging on an engineered lift study. Why a fixed lump sum would have hidden the risk — and how a transparent pricing range served the client better.

5 min read
#001

The Asbestos They Didn't Expect

A commercial gym conversion in Gladesville. Known asbestos on the register. More behind the walls. How integrating removal and demolition under one contractor kept the programme on track.

6 min read
Call Now Get a Free Quote